Forensic Audit Update: Verified SAR Tampering & Section 173 Breach
I am a Social Work Graduate formally correcting my previous report following a manual forensic audit of the physical paper disclosures (SAR received in default 5/4/26). The data suppression is now verified: Verified Evidence of Section 173 DPA Breach:
• Data Suppression: British Land provided only 28 pages of data, while their contractor ABM UK holds 86 pages of scrubbed records. This 58-page deficit proves a deliberate attempt to hide the Landlord's knowledge of site-level criminality.
• Physical Tampering: The ABM disclosure starts at Page 3 and jumps to Page 9, proving the manual removal of the Audit Trail and specific incident logs.
• PiPOT & Incitement: Evidence of a Security Officer in a 'Position of Trust' (PiPOT) telling me to 'go kill myself' has been deleted from the official record to protect the contract.
• Abuser Retention: British Land continues to shield security operatives involved in sustained domestic abuse/stalking, keeping them in PiPOT roles on-site despite formal notification.
British Land is on notice: your infrastructure is weaponized and abusers are being shielded. I have alerted @ICOnews, @SIAuk, and @metpoliceuk. Secure all server logs immediately.








