Asking for a full refund on our $10k+…
Asking for a full refund on our $10k+ flooring project.
Complaint filed with Consumer Protection Ontario. Small Claims Court claim has been served on Hardwood Giant.
Since this is now in the legal process, I'm sticking to facts.
The invoice charged us for 77 boxes of flooring. During installation, we personally counted 65 boxes used on the project. When we questioned the gap, the store manager told us the extra packaging "was used as padding." We trusted that at the time. Later, when we removed the planks over a separate subfloor issue, there was no packaging underneath — and using packaging as padding isn't an allowed installation practice to begin with; it can void the manufacturer's warranty.
We ran the numbers against the actual floor area. Total project area was approximately 1,210 sq. ft., at approximately 19.65 sq. ft. per box. With a standard 5% allowance, that's 1210 / 19.65 × 1.05 ≈ 65 boxes — matching our own count exactly. Even applying the store manager's own stated 10–12% allowance, that's only about 68–69 boxes. Still nowhere near the 77 boxes billed.
The subfloor had significant unevenness. It was never addressed, and never disclosed to us, before installation. The result: large humps, gaps, hollow spots, and squeaking throughout — not a cosmetic issue, a structural one.
The manufacturer's installation guidelines require 1.5–3mm underlayment. Ours measured approximately 1mm, and wasn't even installed as a continuous layer — there were gaps. The guidelines also require 48–72 hours of on-site acclimation before installation; ours was installed the same day it arrived. Neither is a minor detail for a professional installation.
Workmanship throughout was unacceptable: transition strips glued instead of fastened (one on the stairs came loose and became a safety hazard), unfastened baseboards, incomplete caulking, old carpet nails and staples left under the subfloor, a vent cover that didn't fit and was left loose, and a wardrobe door never reinstalled.
A second worker was sent to fix some of the smaller items — baseboards, the vent cover, the door, some transition strips. For the subfloor, he proposed adding a layer of plywood over it — a fix none of the independent contractors we later consulted recommended — and asked us to rent a sander from Home Depot ourselves, because he didn't have one. A flooring contractor without a sander is not something you expect.
Hardwood Giant's final offer was to remove and reinstall the flooring at no additional installation charge. That doesn't address the overbilling, the manufacturer's installation violations, the warranty exposure, or the risk of further damage from a second removal and reinstall.
Proceed with caution.
July 12, 2026
Unprompted review